– 48 –
3-2 Connecting Rod Installation Procedure
1. Install the connecting rod to the bearing with the projections engaged. Apply oil
generously to the bearing surface.
2. For installation, take care so that the letters “YY” are to the left.
3. Apply oil generously to the threaded portion of the bolt , the contact surface of the
connecting rod cap, and the contact surfaces of the nuts .
4. Tighten the nuts to 15Nm (1.5 m·kg) with a torque wrench.
5. Further tighten the nuts to a rotation angle of 150°.
CAUTION:
•
••
• Perform steps 4 and 5 on both nuts.
•
••
• Be sure to check the direction in which to install the connecting rod cap.
•
••
• Do not reuse the bolts and nuts once used.
•
••
• For installation of new connecting rods, use four of them with the same alphabetical
letter (weight classification sign).
Parts List
No. PART No. PART NAME Q'TY REMARKS
1 5SL-11650-00 CONN.ROD ASSY.,1 4
2 5SL-11654-00 BOLT,CONN.ROD (8)
3 90179-07652 NUT (8)
4 5SL-11656-XX BRG.,CONN.ROD 4
1 4
2
3
3
3
Comments to this Manuals