Yamaha YZF Owner's Manual Page 62

  • Download
  • Add to my manuals
  • Print
  • Page
    / 118
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 61
PERIODIC MAINTENANCE AND ADJUSTMENT
7-11
7
To install the cowling
1. Connect the turn signal light lead
coupler.
2. Fit the projections into the slots,
slide the cowling rearward, and
then fit the forward-most projection
into the slot.
3. Fit the projection on cowling A into
the hole in cowling B as shown.
4. Install the bolts, quick fasteners,
and quick fastener screw.
EAU39092
Cowling C
To remove the cowling
1. Remove cowling B and panel B.
(See page 7-9.)
2. Unfasten the wire harness by
pressing on the projection to open
the plastic fastener.
1. Cowling A
2. Turn signal light lead coupler
1. Cowling B
2. Turn signal light lead coupler
1. Cowling A
2. Turn signal light lead coupler
1. Cowling B
2. Turn signal light lead coupler
1. Cowling A
2. Cowling B
U13S12E0.book Page 11 Tuesday, September 15, 2009 1:52 PM
Page view 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 117 118

Comments to this Manuals

No comments