Engine Removal / Installation
Yamaha 1200 pv
v 1.0 © 2001 Short Block Technologies
9
4.2 Install the pump grease bracket and
bolt. Install the PTO shroud and bolt.
• Torque to 7.2 ft. lbs. (bracket)
• Torque to 16 ft. lbs. (bolt)
4.1 Align the oil pump key and using a
new gasket, reinstall the pump. Install the
bleed screw bracket.
• Torque to 8.7 ft. lbs.
• Torque to 8.7 ft. lbs.
3.4 – 3.5 Using new gaskets, install the
carbs on the intake manifold. Re attach the
pulse lines, fuel lines, throttle and choke
cables.
• Torque to 16 ft. lbs.
3.3 Install the flame arrestor base and
elements to the carbs.
• Torque to 12 ft. lbs.
3.2 Install the flame arrestor cover.
3.1 Install the air intake.
• Torque to 16 ft. lbs.
2.8 Using a new gasket, install the exhaust
manifold.
• Torque to 16 then 28 ft. lbs.
2.6 - 2.7 Install the exhaust head pipe to
the manifold using a new gasket, and install
the front bracket. Install the head pipe
waterlines.
• Torque to 28 ft. lbs.
• Torque to 28 ft. lbs.
2.5 Install the front exhaust waterline.
2.4 Install the rear pipe section to the
cylinders and install the bolts.
• Torque to 28 ft. lbs.
2.3 Install the exhaust water jacket coupler.
2.2 Install the through-hull coupling clamp,
exhaust rear waterline and temp sensor.
• Torque to 28 ft. lbs.
2.1 Install the exhaust heat shield.
• Torque to 8.7 ft. lbs.
Comments to this Manuals