Yamaha AR230 Specifications Page 277

  • Download
  • Add to my manuals
  • Print
  • Page
    / 358
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 276
8-5
Step Procedure / Part Name Q’ty Service Points
COOLING SYSTEM AND
WATER LOCK REMOVAL Follow the “Step” order for removal.
1 Band, Hose 18 2
2 Clip 2
3 Hose 1 2
4 Joint, Hose 1 2
5 Clip 2
6 Nut 2
7 Cap, 1 2
8 Joint Assy 2
9 Band, Hose 18 2
10 Clip 2
11 Hose (L=1250) 2
12 Clip 2
13 Band, Hose 18 2
14 Hose (L=900) 2
15 Floor, Drain 2 Apply clear silicone around the flange of
the fitting.
16 Clip 2
17 Housing, Thermostat 2
18 Band, Hose 6 Oetiker type clamps.
19 Hose 8 2
20 Joint, Pipe 2 Straight connector for Port pilot water hose.
21 Clip 2
22 Hose 2 STARBOARD hose is shortened to fit.
23 Nut, M14-1.5mm 4
24 Pilot, Water 4 Apply clear silicone around the flange of
the water pilots.
25 Band, Hose 1 Located in engine compartment
26 Clean-out Tray Assembly 1 See pg. 6-6 “Jet Pump Clean-out
Tray RemovaL
27 Band, Hose 2
28 Hose, Exhaust Outlet 1
29 Strap 2
30 Water Lock 1 Apply soapy water to inside of hose ends
on reassembly so that hoses seat
completely on Water Lock
REMOVAL AND INSTALLATION CHART
HULL AND DECK x
8
HULL
DECK
Page view 276
1 2 ... 272 273 274 275 276 277 278 279 280 281 282 ... 357 358

Comments to this Manuals

No comments