Page 12 LIFT-505 BMF Lift Kit Yamaha Drive Gas or Electric Installation Instructions Contents of LIFT-505 Yamaha Drive BMF Lift Kit: a (1 ea.) B
Page 2 Contents of LIFT-505 Hardware Kit: ITEM QTY. DESCRIPTION TORQUE REQUIREMENTS a. 1 ea. 12mm x 25 Hex Head Bolt 69.00 ft. lbs.
Page 10 Adjust the Tow-In and Camber 1. Drive forward and back 20-40 feet to check the tow-in and camber before making adjustments. Only make adjus
Page 4 3. Align the hole in the shock tower with the hole in the cross frame as indicated in yellow. If needed, use a screwdriver to align the hole.
Page 8 6. Identify the U-bracket. When oriented correctly, the bracket will be angled towards the front of the cart. 7. Slide the U-bracket into
Page 6 23. Install the (2) front tires. The stock tires and wheels will not work on the newly lifted cart. Fully tighten the lug nuts on both wheels.
Comments to this Manuals